Highland Valley Centre for Sustainable Waste Management

Location:

Logan Lake, BC

Project Type:

Environmental Engineering
  • SHA provided an environmental assessment for a proposed solid waste
    management facility to be sited at Highland Valley Copper Mine.
  • Designed to accept 600,000 tonnes/yr of solid waste and have a capacity of 50
    million tonnes.
  • Incorporated hydrogeological monitoring well.s
  • The design incorporated a bioreactor, Waste-to-Energy Facility, Leachate
    Recirculation System, Gas Collection System

Contact:

Highland Valley Copper: Mark Freberg (250)523-3200

Project Budget:

$235,000

Interested In Working With Sperling Hansen Associates?