Highland Valley Centre for Sustainable Waste Management
Location:
Logan Lake, BC
Project Type:
Environmental Engineering
- SHA provided an environmental assessment for a proposed solid waste
management facility to be sited at Highland Valley Copper Mine. - Designed to accept 600,000 tonnes/yr of solid waste and have a capacity of 50
million tonnes. - Incorporated hydrogeological monitoring well.s
- The design incorporated a bioreactor, Waste-to-Energy Facility, Leachate
Recirculation System, Gas Collection System
Contact:
Highland Valley Copper: Mark Freberg (250)523-3200
Project Budget:
$235,000